Building requirements for installation of the groats production plant:
Building requirements for installation of the production plant :
Overall dimensions of the production plant :
- Width – 11 m,
- length – 16 m,
- height – 8 m.
For the installation of the production plant, not taking into account warehouses for raw materials, ready production, and waste, you need a one-story building with no less than 180 m2 with a ceiling height – 8 m. For installation of the production plant, is needed floor with a concrete coupler. Requires the construction of foundations for sketches by “OLIS” Ltd. The walls are enough to plaster and whitewash.