Aggregate multi-purpose groats production plant OPTIMATIK-K-30

The aggregate multipurpose groats production line “Optimatic-K-30” is designed for processing barley, wheat, and peas. The equipment is supplied with a metal framework, service ladders and platforms, a hopper system, an aspiration system, a pneumatic conveying system, electrical components, and automation.

As the production line undergoes a control assembly and inspection stage at the factory, its installation and commissioning at the operating site take no longer than three weeks. Therefore, no metal cutting, welding, or drilling work is required during installation.

Assortment, output and productivity

Groats name Actual output, % GOST, output, % Productivity, kg ( input grain) Grain requirements

 

Pearl barley, numbered 65–70 45 1250-1300 Barley for food purposes according to GOST 28672-90
Fine-ground barley of the 3d, numbered 70–75 65 1250-1300 Barley for food purposes according to GOST 28672-90
Wheat polished groats, numbered 80–85 63 1250–1600 Soft wheat not lower than 3rd grade according to GOST 9353-90, or hard wheat not lower than 4th grade according to GOST 9353-90
Wheat crushed groats of the 3d numbered 71–73 60 1250–1600 Soft wheat not lower than 2rd grade according to GOST 9353-90, or hard wheat not lower than 4th grade according to GOST 9353-90
Peas polished, splitted and whole 77–85 77 1250–1600 Peas at least Grade 2 according to GOST 28674-90
Peas polished, splitted 80–82 77 1250–1600 Peas no lower than grade 2 according to GOST 28674-90 And humidity no higher than 12,5%

Characteristics

Model OPTIMATIK-K-30
Productivity, t/day 30
Installed power capacity, kW 145
The average consumption of electricity per ton of processed grain, kW 92
Power 3-phase alternating current
Voltage, 380W, 50Hz
Main intra-workshop transport pneumatic transport
Service personnel, persons 3

The composition of the multipurpose groats mill

Equipment name Quantity, pcs.
Block peeling and chopping of 1
Silo Operations 1
Shelling-grinder Cascade-0,6 1
Chopper DKM-0,8 1
Magnetic column MK-1 2
Block fractionation of 1
Sifter BM-1,2 1
Aspiration column AK-200 4
Bunker finished products 5
Device of beat 5
The system of aspiration and pneumatic kit
Electrical and Automation kit
Bearing metal kit

Building requirements for installation of the groats production plant:

Overall dimensions of the groats production plant:

  • Width – 12 m,
  • length – 15 m,
  • height – 6 m.

For the installation of the groats production plant, not taking into account warehouses for raw materials, ready production, and waste, you need a one-story building with no less than 180 m2 with a ceiling height – 6 m. For installation of the plant, is needed floor with a concrete coupler. Requires the construction of foundations for sketches by “OLIS”. The walls are enough to plaster and whitewash.

Аdvantages

  1. The highest output and quality of groats in the class of small capacity multipurpose groats mill.
  2. Possibility of quick adjustment in case of changing the type of processed grain or the type of groats to be processed.
  3. The basic configuration can be supplemented with options, which significantly increase the possibilities of processing (additional cleaning, splitting of peas, grain enrichment, etc.).
  4. Compactness and low power consumption, which allows the operation of the groats mill in various adapted spaces.
  5. The operation of the groats mill is automatic.
  6. Reliability of the equipment of the groats mill ensures its uninterrupted and long-lasting operation.
  7. Efficient processing of low-grain cereals without reducing the quality of the groats.
  8. Assembly and commissioning of the groats mill within three days.

Grain manufactory may be additionally equipped with a purification unit:

Equipment name Quantity, pcs.
Silo Operations 1
Dispensing unit 1
Magnetic column MK-1 1
Sieve-air separator SHS-3 1
Aspiration system 1